About the Project
STS has again successfully obtained planning for constructing a large basement below the full footprint of the shop at 152-154 Walton Street.
We have prepared a full set of structural and building regulations drawings and the construction method statement following the planning. We have also discharged the Construction Transport Management Plan’s planning condition detailing the site setup and steps required to minimize the site-related transport impact.
In addition to design services, STS has also prepared a full schedule of works and has administered the tender process to select the main contractor appointed in late 2012, with the results started in early 2013.